The renovation storyThe work behind the home.
Confirmed improvements and additional details as they are documented.
Owner-confirmed updateRoof & exterior
2019; front half replaced again in 2024
A 50-year roof was installed in 2019 by Gouge Roofing. The front half was replaced again in 2024.
The owner reports that the manufacturer warranty remains in effect. Buyers should independently verify its terms, coverage, transferability, and available records.
Source: Owner-confirmed October 8, 2026
Owner-confirmed updateSiding, windows & exterior doors
Siding: 2021 · Windows and exterior doors: 2020
Vinyl siding was replaced in 2021. Exterior doors and windows were replaced in 2020.
Supporting records and warranty details have not yet been supplied. Buyers should independently verify details material to a purchase.
Source: Owner-confirmed October 8, 2026
Owner-confirmed updateElectrical capacity & connections
Main panel: 2020 · Other work: completion date not yet supplied
The 200-amp main panel was replaced in 2020, and a 100-amp subpanel was added. Outlets were updated throughout, including some with USB charging ports. A 50-amp exterior generator hookup and 30-amp exterior outlets at the rear of the house and side of the garage were added for camper hookups.
Permit, inspection, contractor, and supporting-record details have not yet been supplied. Buyers should independently verify electrical capacity and connections.
Source: Owner-confirmed October 8, 2026
Owner-confirmed updateLighting & controls
Completion date not yet supplied
Light fixtures and switches were replaced throughout. Some switches or fixtures include motion sensing. New exterior lights were also added.
Supporting records and product details have not yet been supplied. Buyers should independently verify operation and features.
Source: Owner-confirmed October 8, 2026
Owner-confirmed updateWater heating & treatment
Completion date not yet supplied
A 27,000-watt point-of-use electric water heater, a new water softener, and a whole-house water filtration system were added.
Model, installer, warranty, and supporting-record details have not yet been supplied. Buyers should independently verify system capacity, condition, and maintenance requirements.
Source: Owner-confirmed October 8, 2026
Owner-confirmed updateKitchen remodel
Completion date not yet supplied
The kitchen was remodeled with new cabinets, countertop, sink, garbage disposal, refrigerator, oven with cooktop, and overhead microwave with built-in exhaust fan. The refrigerator is identified by the owner as staying and is plumbed with a working ice maker.
Appliance model, age, warranty, and supporting-record details have not yet been supplied. Buyers should independently verify included items and appliance operation.
Source: Owner-confirmed October 8, 2026
Owner-confirmed updateBathrooms & plumbing
Completion date not yet supplied
Two existing bathrooms were gutted and remodeled, and a third bathroom was added. Plumbing was redone and reconfigured.
Permit, contractor, and supporting-record details have not yet been supplied. Buyers should independently verify current condition, permits, and plumbing configuration.
Source: Owner-confirmed October 8, 2026
Owner-confirmed updateFlooring
Completion date not yet supplied
Flooring was replaced throughout, including more than 1,300 square feet of real hardwood flooring, much of it custom; about 300 square feet of tile; and about 100 square feet of high-durability engineered wood.
Exact measurements, product details, and supporting records have not yet been supplied. Buyers should independently verify materials and measurements.
Source: Owner-confirmed October 8, 2026
Owner-confirmed updateComposite deck
Completion date not yet supplied
A new approximately 450-square-foot deck was added with composite decking, concrete pillars, and weed barrier underneath.
Permit, contractor, warranty, and supporting-record details have not yet been supplied. Buyers should independently verify dimensions, condition, and any permit history.
Source: Owner-confirmed October 8, 2026